Studio for sale in The Curve Compound, the Urban Communities
Authority issued a ministerial decision to approve a plan to develop and divide
13.3 acres in the eighth residential neighborhood within the first phase in the New Administrative Capital.
The compound shall be owned by Corner Stone Real Estate Development Company,
to establish an integrated urban community.
Available studio for sale in The Curve New Capital.
According to the ministerial decision, the period of implementing the Zakirve project
and paying the value of the land is two years, ending on August 26, 2022.
Space of The Curve Compound and available studio for
sale in The Curve Compound:
The area of land allocated for housing in the compound is 5.7 acres,
representing 42.5% of the total area of the New Capital Compound.
Available studio for sale in The Curve New Capital.
The area designated for service lands is 2.7 acres, representing 19.9% of
the total project area, and the area designated for green areas and footpaths is 0.239 acres, or 1.8%.
The area of land allocated to internal roads is 0.483 acres, at a rate of
3.6%, and the area allocated to external roads is 4.3 acres.
It represents 32.1% of the total project area.
The building area of The Curve New Capital will be 45% of the total
area allocated to housing land.
in addition:-
The ministerial decision allows the establishment of a ground floor, a basement,
and 7 typical floors, with a maximum of 30 meters in height, as the original conditions of the project.
The housing density achieved in the project is 180 people per feddan,
and the decision stipulated a commitment to leave responses about the
apartment buildings for each building from all sides,
So that it is not less than 25% of the building’s height and not less than 12 meters,
and a distance of not less than two meters is left between the
boundary of the building buildings and the internal road sidewalk.
The decision included the company’s commitment not to offer the project units
for reservation or sale without the approval of the Administrative Capital for Urban Development.
A studio is available for sale in The Curve New Capital.
The procedures for commencing seizure and sale include the decision number and
the project implementation period. In the event of a violation, the
ministerial decision cancel and legal measures are taken.
The company obligate to provide the competent city authority with
the documents necessary to obtain licenses in accordance with the
provisions of the Building Law issued in 2008 and its implementing regulations and amendments thereof.
The company shall fulfill the structural requirements in force as a maximum,
provided that the height restrictions permitted by the Ministry of Defense are not exceeded.
The company commit to providing the executive drawings and
technical specifications for the utility network works according to the
submitted plan, the contracted area, and the timetable approved by
the Administrative Capital for Urban Development.
The company uses solar energy systems in the New Administrative Capital,
in addition to its commitment to provide parking spaces in accordance with
the conditions attached to the decision.