Skip to content
Starts from:2,992,000EGP
Central Point-Downtown, New Capital City

Central Point Tower New Capital City

Administrative
Downtown, New Capital City
Starting from2,992,000 EGP

Last updated:

What is Central Point Tower New Capital City?

Central Point is a commercial project by Town Writers in Downtown, New Capital City, handover in September 2029.

Commercial project
Developed by Town Writers
Completion in September 2029

Where is Central Point located?

Central Point is in Downtown, New Capital City.

New Capital City › Downtown
Where is Central Point located?

What amenities does Central Point offer?

Business hub

Garage

What are Central Point New Capital City prices in 2026?

Central Point New Capital City prices start from EGP 2,992,000.

Central Point unit prices and sizes
Unit typeAreaStarting price
Administrative32 – 80 m²2,992,000 EGP

2,992,000 EGP

32 - 80 m²
Delivery: October 2029
Finishing: Fully finished
What are Central Point New Capital City prices in 2026? — Administrative

Central Point brochure

The official project brochure from Town Writers.

Central Point New Capital City payment plans: what are the options?

Central Point payment plans: from 15% down payment, instalments up to 14 years.

Payments
Amount / %
Down payment
On contract signature
15%
Instalments until handover
Equal instalments over 3 years
18.2%
Handover
Unit delivery
2029
Instalments after handover
Equal instalments over 11 years
66.8%

What are the pros and cons of Central Point?

In figures: Central Point against the median of 123 projects in Downtown on Masharf.

Pros

  • The price per m² in Central Point starts from EGP 93,500; the median of Downtown projects on Masharf is EGP 154,245.
  • The starting price in Central Point is EGP 2,992,000; the median of Downtown projects is EGP 5,407,700.
  • Instalments in Central Point run up to 14 years; the median of Downtown projects is 10 years.

Cons

  • The down payment in Central Point starts from 15%; the median of Downtown projects is 10%.
  • Central Point is handed over in 2029; the median of the Downtown projects still under construction is 2027.

About Central Point Tower New Capital City

Central Point Tower New Capital City: an 80 m² office for under 4 million?

Central Point Tower New Capital City is a 16-floor block of offices and shops from Town Writers in Downtown, the developer behind Striple Walk. Its plot is about 4,639 m² per the project data, and the tower has a ground floor and two floors of shops topped by 13 office floors, all with central air conditioning. Handover is October 2029, at 15% down over 14 years.

The offices, and one figure worth questioning

In October 2026 the developer's offices were sized 32 to 80 m² and priced roughly 2.99 to 3.91 million. On the 32 m² unit, that is close to 93,500 per metre. But if the top price belongs to the 80 m² office, its metre is only about 49,000, half the small office's, with 48 extra metres for about 920,000 more. That is a very large gap between two units in the same tower.

Ask before celebrating

One possibility is that the big office sits on a lower floor or weaker position, or that the figure is a typing error. The other is that the offer is genuine, in which case it is one of the cheapest office metres in all of Downtown. Either way, ask the developer for a written quote for the 80 m² office by name, floor and unit number.

Fourteen years of instalments

The smallest office needs about 449,000 at signing, then around 15,100 a month. That mirrors Striple Walk: same developer, same 14 years, same deposit. The difference is that Central Point is a single small tower while Striple Walk has hundreds of offices, so there is less competition for tenants here, but also fewer shared services than a big scheme.

Downtown neighbours

So even the small office here undercuts most neighbours by about 25,000 a metre; only Radix is cheaper, and it hands over two years earlier.

Owners' listings

Two resale offices of 38 to 42 m² ask about 2.5 to 6.5 million, and two 35 m² shops are listed, one at 12 million and the other at about 3.18 million. A gap of about 9 million between shops of the same size most likely means the cheaper one reflects only the amount paid, or sits on an upper floor rather than the ground. Ask before comparing.

Three likely buyers

  • A small investor wanting a Downtown office with under half a million down and about 15,000 a month.
  • A start-up founder wanting small premises near the Government District and Al Masa, with no rush on handover.
  • Someone after more space for little money, if the 80 m² price proves right.

If you need an office to work from next year, 2029 is too far off; UniTower or Radix are closer.

Around the tower

Al Masa Hotel is some 5 minutes off and Masjid Misr 4, per the project data, with the Government District, North Bin Zayed Axis and the Sokhna road all close. There are green areas and outdoor seating, lifts, parking, plus security, CCTV and maintenance.

Town Writers

Before 2023 the company traded as Eight Developments, the project data says. We also list its Striple Walk, plus The Strip Mall and 88 Hub Mall in Downtown.

Want a written quote for the 80 m² office? Message Masharf's WhatsApp.

Central Point Tower New Capital City FAQs

Where is Central Point in the New Capital?
In Downtown, per the project data about 5 minutes from Al Masa Hotel and 4 from Masjid Misr, near the Government District.
How much is an office at Central Point?
Per the developer's October 2026 offers, offices of 32 to 80 m² at about 2.99 to 3.91 million. Ask the exact price of the 80 m² office.
What is the payment plan at Central Point?
15% down and the rest over 14 years, so the smallest office runs at about 15,100 a month.
When is Central Point handed over?
Handover is October 2029.
How many floors does Central Point have?
Per the project data, a ground floor, two retail floors and 13 office floors, on a plot of about 4,639 m².
Who is the developer of Central Point?
Town Writers, formerly Eight Developments, which also has Striple Walk and The Strip Mall.
Which unit types are available at Central Point?
Unit types: Administrative.
What is the status of Central Point and when is it delivered?
Delivery: September 2029.

Similar Projects