Skip to content
Price on Request
Intro Complex Hub-6th of October City
Off Plan

Intro Complex Hub Mall October

Administrative, Medical, Retail
6th of October City

Ask about the prices and floor plans on offer, and we'll send you the details on WhatsApp.

Last updated:

What is Intro Complex Hub Mall October?

Intro Complex Hub is a commercial project by Roshan Masr Developments in 6th of October City, handover in January 2030.

Commercial project
Developed by Roshan Masr Developments
Completion in January 2030

Intro Complex Hub Mall October location: where exactly is it?

Intro Complex Hub is in 6th of October City.

What amenities does Intro Complex Hub Mall October offer?

Security

Elevators

What units does Intro Complex Hub Mall October have?

Ask about the prices and floor plans on offer, and we'll send you the details on WhatsApp.

Intro Complex Hub unit prices and sizes
Unit typeArea
Administrative50 – 68 m²
Medical50 – 91 m²
Retail66 – 351 m²

Clinics for sale in Intro Complex Hub 6th of October City

Clinics for sale in Intro Complex Hub 6th of October City: Administrative, Medical, Retail.

Price information is currently unavailable
50 - 68 m²
Delivery: January 2030
Floor plan currently unavailable

Intro Complex Hub Mall October brochure

The official project brochure from Roshan Masr Developments.

Intro Complex Hub 6th of October City payment plans: what are the options?

Intro Complex Hub payment plans: from 0% down payment, instalments up to 10 years.

Payments
Amount / %
Down payment
On contract signature
0%
Instalments until handover
Equal instalments over 4 years
66.7%
Handover
Unit delivery
2030
Instalments after handover
Equal instalments over 2 years
33.3%

What are the pros and cons of Intro Complex Hub Mall October?

In figures: Intro Complex Hub against the median of 267 projects in 6th of October City on Masharf.

Pros

  • The down payment in Intro Complex Hub starts from 0%; the median of 6th of October City projects is 5%.
  • Instalments in Intro Complex Hub run up to 10 years; the median of 6th of October City projects is 9 years.

Cons

  • Intro Complex Hub is handed over in 2030; the median of the 6th of October City projects still under construction is 2027.
  • Intro Complex Hub has 2 amenities; the median of 6th of October City projects is 5.

About Intro Complex Hub Mall October

Intro Complex Hub Mall October is a retail, office and medical mall by Roshan Masr Developments on 4 feddans, directly on the Central Axis next to Vodafone Square in 6th of October City. Shops start at 66 m², offices and clinics at 50 m², and the announced price per metre for shops starts at EGP 144,000 (September and November 2026). Buyers can pay 0% down over 6 years, or 10% down over up to 10 years, with handover in 2030.

This page is for someone weighing a shop, an office or a clinic at Intro Complex Hub. Masharf (Keller Williams Masharf) gathered the figures below from more than one source, and each number carries the month it was announced.

Intro Complex Hub at a glance

Intro Complex Hub is a three-activity mall (retail, administrative and medical) spread over 9 buildings, which cover only about 40% of the 4-feddan plot.

ItemIntro Complex Hub Mall October
DeveloperRoshan Masr Developments
LocationCentral Axis, next to Vodafone Square, 6th of October City
Land4 feddans
Buildings9, each with 2 basements, a ground floor and 4 typical floors
UsesShops, administrative offices, clinics, restaurants and cafés
ArchitectRaef Fahmy
OperatorKAD
Development and asset managementAxes
Handover2030

Who is the developer of Intro Complex Hub?

Intro Complex Hub is developed by Roshan Masr Developments, a company built on Egyptian and Saudi expertise and partnerships, and the mall is its first project in Egypt.

So there is no finished Roshan Masr project in Egypt to visit before you book. The team around the developer matters more as a result. Raef Fahmy leads the architecture, KAD will manage and operate the mall, and Axes handles development and asset management, which covers how the mall's value is managed over the long term.

Having an operator named from day one matters to a shop or clinic owner. A commercial mall succeeds or fails after it opens, on security, cleaning, parking and the tenant mix. If you book, ask to see the management agreement, who sets the service charge, and when it starts.

Where is Intro Complex Hub located?

Intro Complex Hub sits directly on the Central Axis of 6th of October City, next to Vodafone Square, with four residential districts around it.

Drive times from the mall, as published in September and November 2026:

  • Gamal Abdel Nasser Axis: about 2 minutes.
  • 26th of July Corridor: about 5 minutes.
  • Dahshur Link: about 5 minutes.
  • Middle Ring Road: about 7 minutes.

October General Hospital and Cleopatra Hospital are close to the mall, and so is Mall of Arabia. For a doctor buying a clinic, that puts two known hospitals a short distance away.

Being on the Central Axis means a shop faces a main road inside the city itself. Customers from the four surrounding districts reach it without getting on a highway.

Intro Complex Hub unit sizes

The smallest unit at Intro Complex Hub is a 50 m² office or clinic. Shops run from 66 m² on the ground floor to 351 m² on the first floor.

UnitSize (m²)
Ground-floor shop66 to 98
First-floor shop78 to 351
Administrative office50 to 68
Medical clinic50 to 91
Restaurant or café92, plus 12 outdoors

A ground-floor shop is smaller, up to 98 m², and sits at street level. A first-floor shop can reach 351 m², about three and a half times the 98 m² ceiling downstairs.

Clinics at Intro Complex Hub are handed over finished, so a doctor can install equipment and start. For offices and shops, get the finishing level written into the contract before paying.

Intro Complex Hub prices

The announced price per metre for shops at Intro Complex Hub Mall October starts at EGP 144,000, in both September and November 2026.

In September 2026, a discount of up to 10% was announced on shops and up to 15% on offices and clinics.

That metre price is the entry point for the lowest-ranked shop. A shop facing the plaza or the Central Axis is priced differently from one inside a corridor, so ask for the price of the exact unit, with its number and floor, rather than the general rate.

When comparing with other malls in October, compare a shop with a shop on the same floor and with the same finishing. A ground-floor metre and a first-floor metre are different products, and mixing them gives a meaningless number.

Intro Complex Hub payment plan

Intro Complex Hub has three instalment plans: 0% down over 6 years, 5% down over up to 8 years, or 10% down over up to 10 years.

PlanDown paymentPayment after 2 yearsTerm
10%None6 years
25%5%Up to 8 years
310%5%Up to 10 years

The 0% plan carries a higher instalment, since the full price is spread over only 6 years. Plans 2 and 3 include an extra 5% two years after signing, which you need to budget for from the start.

A buyer who wants to rent out a shop receives it in 2030, before the last instalment under all three plans. The years after handover will see rent and instalments running together, which is why the 10-year plan is easier on an investor's cash flow.

Intro Complex Hub completion date

Units at Intro Complex Hub are due for handover in 2030, about three and a half years after contracting.

The mall is still under construction and has no ready units. Anyone who needs a working shop now will not find it here, and an investor should count on no rent before 2030 and before the mall actually opens. Ask for the handover date in the contract, together with the penalty clause for delay.

Intro Complex Hub master plan and design

The Intro Complex Hub master plan has 9 separate buildings joined by bridges, stairs and lifts, with buildings on 40% of the land and the rest left as open space, greenery and a plaza.

Each of the 9 buildings has 2 basements for parking, a ground floor and 4 typical floors. The highest unit is on the fourth floor, so a patient or client never has to ride up a tower to reach a clinic or office.

The 60% of open space helps the restaurants and cafés, because it gives room for outdoor seating.

Intro Complex Hub services

Services at Intro Complex Hub include security guards and CCTV, basement parking for visitors and staff, and lifts and escalators.

  • Electronic gates, maintenance and cleaning.
  • Internet and meeting rooms for the offices.
  • A children's play area.
  • Restaurants, cafés and open seating.
  • ATMs and a gym.

Basement parking matters for any clinic or office on the Central Axis. A patient who cannot find a place to park goes somewhere else.

Six things to ask before booking at Intro Complex Hub

Before booking at Intro Complex Hub, confirm the price of the unit itself, its floor and permitted activity, and that the 2030 handover is written into the contract.

  1. Unit number and floor. Ground and first-floor shops differ in size and price, so ask for the floor plan and see exactly where your unit is.
  2. Permitted activity. The mall mixes retail, offices and clinics, so check that your activity is allowed on that floor and whether a similar business sits next door.
  3. The discount. Is the 10% or 15% discount announced in September 2026 still offered, and does it apply to instalment plans or only to cash?
  4. The 5% after two years. Under plans 2 and 3, find out its exact date.
  5. Finishing. Clinics come finished; get the level for offices and shops in writing.
  6. Service charges. How much, who sets them, and whether they start at handover or at opening.

Intro Complex Hub vs Kawn Business Complex vs Space Mall

Intro Complex Hub asks for a lower down payment than the other two, but hands over later: 2030, against end-2029 for Kawn Business Complex and February 2028 for Space Mall's shops.

MallShop size (m²)Shop entry price (EGP)Down payment and termHandover
Intro Complex Hub66 to 351From 144,000 per m² (Sep and Nov 2026)0% over 6 years, or 10% over up to 102030
Kawn Business complex 6th of October City54 to 15010,200,000 (Oct 2026)5% over 7 years, or 15% over 10End of 2029
Space Mall 6th of October City194 to 20026,408,344 (Nov 2026)10% over 7 yearsFebruary 2028

Kawn Business Complex, by Elaf Developments, is on the Gamal Abdel Nasser Axis next to Mall of Arabia and adds serviced apartments to its shops, offices and clinics. Space Mall, by Gates Developments, hands over sooner, but its shops are large and need a higher down payment. Intro Complex Hub sits between them, with small ground-floor shops, large first-floor ones and the lowest down payment of the three. For other malls and projects in the city, see 6th of October City projects.

Intro Complex Hub pros and cons

The strongest points of Intro Complex Hub are its Central Axis frontage and its 0% down plan. The weakest are a developer with no handed-over project in Egypt and a 2030 handover.

Pros

  • Directly on the Central Axis, 2 minutes from the Gamal Abdel Nasser Axis.
  • Three activities in one place, so a clinic's patient can also be a shop's customer.
  • 0% down, or up to 10 years of instalments.
  • 60% of the land left as open space.
  • An operator and an asset manager named from the start.

Cons

  • Roshan Masr's first project, with no finished project to judge it by.
  • Handover in 2030, so no rent before then.
  • Whether the mall works will only show after it opens.
  • An extra 5% after two years under two of the three plans.

Intro Complex Hub Mall October FAQs

Where is Intro Complex Hub located?
Directly on the Central Axis of 6th of October City, next to Vodafone Square, about 2 minutes from the Gamal Abdel Nasser Axis and 5 minutes from the 26th of July Corridor.
Who is the developer of Intro Complex Hub?
Roshan Masr Developments, a company with Egyptian and Saudi partnerships. The mall is its first project in Egypt.
What are Intro Complex Hub prices?
The announced price per metre for shops starts at EGP 144,000 (September and November 2026). In September 2026 a discount of up to 10% on shops and 15% on offices and clinics was announced.
What is the Intro Complex Hub payment plan?
0% down over 6 years, 5% down over up to 8 years, or 10% down over up to 10 years. The last two add another 5% two years after signing.
What is the smallest unit at Intro Complex Hub?
A 50 m² office or clinic. Shops start at 66 m² on the ground floor and reach 351 m² on the first floor.
What is the Intro Complex Hub completion date?
Handover is set for 2030, about three and a half years after contracting. The mall is still under construction.
Are Intro Complex Hub clinics finished?
Yes, clinics are handed over finished. For offices and shops, get the finishing level written into the contract.
Who will manage Intro Complex Hub Mall?
KAD will manage and operate the mall, Axes handles development and asset management, and the architecture is by Raef Fahmy.
Which unit types are available at Intro Complex Hub?
Unit types: Administrative, Medical, Retail.
What is the status of Intro Complex Hub and when is it delivered?
Project status: off-plan. Delivery: January 2030.

Similar Projects